Call to Order
Don Paggeot called the meeting to order at 7pm.
Approval of May 14, 2002 Minutes
There were no modifications to the minutes and they were approved
as written.
Noise Monitoring
Colin presented radar track data demonstrating the consistent
nature of the traffic patterns around Paine Field. Quarterly noise
complaint data associated with the noise report was also reviewed.
Current Projects
Bruce Goetz addressed the current projects now on going at Paine
Field.
NPCHA Hangars. Project is complete and the North Paine
Corporate Hangars are all occupied at this time.
West Ramp Development. Construction has begun on the west
ramp. Currently we have close to 93% pre-lease rates on these
hangars. The anticipated completion date of the project is
December. The only short-term impact on airport users will be
associated with a storm sewer line being installed under taxiway
Alpha and Hotel in two weeks.
New Tower. The siding contractor has now finished the
exterior potion of the tower construction and the glass
installation is scheduled in two weeks. Completion of the project
is still scheduled for fall of 2003.
Taxiway Lighting Upgrade Project. The current system has
direct buried cable and lights on stakes, which creates a
maintenance headache with shorts and breaks in the system. An
enclosed system using conduit and lights in cans will relieve a
lot of these problems and bring the whole airport up to standard
for lighting. In addition, a new back-up generator will be
installed to replace an aging generator that is becoming a
maintenance problem and new power regulators will also be
installed. We are hoping to receive money from the FAA in
September to pay for this project.
Dave Waggoner presented the remaining current projects.
WASDOT Mukilteo BLVD widening. There has been a two-week
delay in opening the bids for the Mukilteo Speedway widening
project. However, once the bids are awarded the project should
take around 12 months to complete.
Public Works Solid Waste Transfer Station. The roadway to
the east condos (Minuteman Road) has been paved and is open at
this time. Facility construction has begun and the transfer site
is scheduled to be open for business in the spring of 2003. Once
the heavy portion of construction on site is completed the final
lift of pavement on minuteman road will be placed.
Flight Across America. The kick-off event for Flight Across
America, now a national movement, occurred last Sunday as pilots
began the flights to land at every general aviation airport in the
nation over the next month. The flights are meant to promote
general aviation in this country and memorialize the tragic events
of last 9-11.
Airspace Obstruction Removal. Obstructions currently exist
at Paine Field with numerous penetrations into protected approach
and transitional air spaces. Surveys are being completed to
identify the specific penetrations requiring removal and permits
to begin the removal of these trees are expected in two weeks.
NFIC—MOF Tour Center. Other sources for financing for the
NFIC are still being sought in an effort to make this facility
possible.
Olympus Terrace Sewer District Pipeline Project. As part of
the replacement of the OTSD sewer pipe system in Big Gulch, we are
working with the city of Mukilteo and OTSD to get approval to
construct a by-pass system pipe to handle storm water overflows
which currently are eroding both the pipe and Big Gulch. This is
not an Airport project, but Paine Field has been asked by OTSD to
participate.
Master Plan 2001 Update
The final advisory committee meeting was held two weeks ago at the
Everett Transit center. The recommended changes to the draft are
being made with the final version to be submitted to the county
council for approval in two months. The master plan remains
consistent with the mediated role of Paine Field.
Tenant Updates
None
Public Comments
Hal Meyer expressed appreciation for Colin’s work on answering
the difficult noise questions and using the AFTEMS system so
effectively.
Adjournment
Motion to adjourn was made, seconded and passed. Don Paggeot
adjourned the meeting at 8:14
|